San Francisco Public Library Venue Stage and Load-In

San Francisco Public Library venue information:

Main Library

San Francisco Public Library Main Basement Loading Dock

San Francisco Public Library Main Basement Loading Dock II

San Francisco Public Library Main Route to Latino/Hispanic Meeting Room

San Francisco Public Library Main Latino/Hispanic Meeting Room

The elevator on street level near the Grove Street library entrance has a door that is 7′ tall and once in the elevator it is taller, 6′ wide, and 4.5′ deep.

Bernal Heights Branch Library

Street Parking and Load-In Entry from building exterior:

Front Door Entry to library:

Meeting Room:

The door from the meeting room to the outside patio is 6’11” in height and 3’5″ wide.

The ceiling height of the Meeting Room is 8′ under the beams and 7’8″ under the light fixtures.

Richmond Branch Library

A photo gallery of images starting with the street parking and entrance on one side of the Richmond Branch of the San Francisco Public Library system, continuing with the access to the Program Room within the library, and ending at the exit and street parking on the other side of the library.

The ceiling height of the Program Room is 8’9″ under the ceiling fixtures and 8’2″ under the lighting fixtures.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.